TM 5-3805-254-20-1
ORGANIZATIONAL TROUBLESHOOTING - CONTINUED
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
Step 9.
Set multimeter to 20 vdc scale. Connect red test lead to output terminal (11) on throttle switch (9) and
black test lead to ground. Have assistant rotate KEY SWITCH (3) clockwise to on position. Check for
11 to 13 vdc on multimeter. Have assistant rotate KEY SWITCH (3) counterclockwise to off position.
Disconnect test leads and jumper wire.
a.
If multimeter does not read 11 to 13 vdc, replace throttle switch (10) (page 2-695).
b.
If multimeter reads 11 to 13 vdc, go to step 10.
2-125