TM 5-3805-254-20-1
TURBOCHARGER PIPING - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION
21
Air cleaner air
Hose clamp (6)
Put on.
hose (3)
22.
Turbocharger air
Hose clamp (7)
Put on.
hose (2)
23.
Turbocharger (8)
Air pipe (1), turbo-
Aline and push into place as an assembly.
and air cleaner (9)
charger air hose (2),
air cleaner air hose
(3), and hose clamps
(6 and 7)
24.
Turbocharger air
Hose clamp (7)
Position to secure air hose to turbocharger
hose (2)
(8) and tighten using 1/4-inch flat-tip
screwdriver.
25.
Air cleaner air
Hose clamp (6)
Position to secure air cleaner hose to air
hose (3)
cleaner (9) and tighten using 1/4-inch flat-
tip screwdriver.
NOTE
FOLLOW-ON MAINTENANCE: Close right and left side hood panels (page 2-424).
TASK ENDS HERE
2-451