TM 5-3805-254-20-2
SLAVE RECEPTACLE
This task covers:
a.
Removal (page 2-895.0) c. Installation (page 2-895.2)
b.
Cleaning (page 2-895.0)
INITIAL SETUP
Equipment Conditions
Materials/Parts
Battery cables disconnected (page 2-424).
Detergent, liquid, GP (item 7, appendix C)
Left and right side hood panels opened (page
Rags, wiping (item 15, appendix C)
2-424).
Lockwasher, slave receptacle to splash plate
(four required)
Tools/Test Equipment
Lockwasher, starter solenoid
Lockwasher, engine
Wrench, box-end, 1/2-inch (two required)
Wrench, box-end, 3/4-inch
Personnel Required
Wrench, open-end, 3/4-inch
One
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
1. Starter solenoid (1)
Nut (2), lockwasher
a. Using 3/4-inch box-end wrench, unscrew, and
(3), slave receptacle
take off.
cable (4), and cable (5)
b. Get rid of lockwasher.
2. Left side of engine
Screw (7), lockwasher
a. Using /4-inchbox-endwrench,unscrew, and
(6)
(8), and slave
take off.
receptacle cable (9)
b. Get rid of lockwasher.
3. Left splash plate
Four nuts (11),
a. Using two 1/2-inch box-end wrenches, unscrew,
(10)
lockwashers (12), and
and take out.
screws (13)
b. Get rid of lockwashers.
4.
Slave receptacle (14)
Take off.
CLEANING
NOTE
For more information on how to clean parts, go to General Maintenance Instructions (page 2-424).
5.
Slave receptacle (14)
a. Using liquid detergent and water, clean.
and two slave
b. Using wiping rags, dry.
receptacle cables
(4 and 9)
Change 1 2-895.0