TM 5-3805-274-10
Table 3-1. Operator PMCS - M917 Dump Truck Body
B - Before
D - During
A - After
W - Weekly
M - Monthly
INTERVAL
ITEM TO BE INSPECTED
FOR READINESS REPORTING
ITEM
PROCEDURE: Check for and have repaired,
Equipment is Not Ready/
NO
B
D
A
W
M
Filled Or Adjusted as needed
Available If:
NOTE
Item number of columns shall be used as a
source of item numbers for the "TM Number"
column
on
DA
Form
2404,
Equipment
Inspection and Maintenance Worksheet, in
recording results of PMCS.
Within designated interval, these checks are to
be performed in the order listed.
Perform weekly as well as before PMCs if you
are the assigned driver but have not operated
the vehicle since the last weekly, or you are
operating the vehicle for the first time.
ELECTRICAL SYSTEM
1
Visually inspect wiring and
connectors for obvious dam-
age, breaks or fraying.
2
Make sure all clearance
lamps are working; pull out
headlamp switch on truck
instrument panel and check
marker lamps.
DUMP BODY (CARGO)
3
Visually inspect cargo body,
Cracked, broken welds.
cab protector and tailgate
for obvious damage, weld
breaks.
4
Visually inspect for hydrau-
Class III leaks are
lic leaks.
evident.
3-4
