TM 5-3805-274-10
Table 3-1. Operator PMCS - M917 Dump Truck Body - Continued
B - Before
D - During
A - After
W - Weekly
M - Monthly
INTERVAL
ITEM TO BE INSPECTED
FOR READINESS REPORTING
ITEM
PROCEDURE: Check for and have repaired,
Equipment is Not Ready/
NO
B
D
A
W
M
Filled Or Adjusted as needed
Available If:
12
Check the hydraulic control
Control mechanism
lever for the following:
doesnt work properly
or Class III leaks are
(1) Control lever returns
evident.
to N (neutral) from
UP and DOWN posi-
tions.
(2) Grip head operates
smoothly and control
lever moves without
binding.
TA 075418
3-8