TM 5-3805-254-20-1
RADIATOR - CONTINUED
NOTE
FOLLOW-ON MAINTENANCE: Close right and left side hood panels (page 2-424).
TASK ENDS HERE
THERMOSTAT
This task covers:
a.
Removal (page 2-634)
c.
Installation (page 2-634)
c.
Testing (page 2-634)
INITIAL SETUP:
Tools
Materials/Parts - Continued
Container, metal, 1/2-gallon
Sealer, silicone (item 16, appendix C)
Extension, 6-inch, 1/2-inch drive
Lockwasher, thermostat housing (five required)
Handle, ratchet, 1/2-inch drive
Scraper,
Personnel Required
Screwdriver, flat-tip, 1/4-inch
Socket, 9/16-inch, 1/2-inch drive
One
Thermometer, 0° to 220°F
Equipment Condition
Materials/Parts
Cooling system drained (page 2-628).
Gasket, thermostat housing (one
Left and right side hood panels opened
required)
(page 2-424).
2-633