TM 5-3805-254-20-2
DUMP BODY REFLECTORS - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION
3.
Body (2)
New reflector (4)
a.
Place in position.
b.
Drill two holes using 1/4-inch portable
electric drill and number seven twist
drill.
c.
Tap two holes using 1/4-inch 20-NC tap
and adjustable tap handle.
4.
New reflector (4)
Two screws (5)
Screw in and tighten using number two
to body (2)
cross-tip screwdriver.
TASK ENDS HERE
TA244536
2-1323