TM 5-3805-254-20-2
TRANSMISSION OIL PRESSURE GAGE LINE AND FITTINGS - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
59
90-degree elbow (5)
Line (4)
Screw on and tighten using 1/2-inch and
9/16-inch open-end wrenches.
60
Gage (7)
Wrap pipe threads with antiseizing tape
(page 2-424).
61
90-degree elbow (8)
Screw on and tighten using 9/16-inch open-
end wrench.
62
90-degree elbow (8)
Line (4)
a
Screw on and tighten using two 9116-
inch open-end wrenches.
b
Get rid of tag.
63
Instrument panel (9)
Lower center
Put in.
instrument panel (10)
TA244628
2-1463