TM 5-3805-264-13&P
0017
Table 1. Operator Preventive Maintenance Checks and Services (PMCS) - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
4
During
Dump Body
1. Check hydraulic control lever (Figure 1, Item 1),
Hydraulic control lever
Controls and
MCS control unit (Figure 1, Item 2), and indicator light
malfunctions. MCS
Indicators
(Figure 1, Item 3) (M917A1 with MCS and M917A2
control unit malfunctions
with MCS) for proper operation.
and is required for
mission.
Figure 1. Dump Body Controls and Indicators.
2. Monitor body up and body (transport) lock indicator
Any indicator light or
lights (Figure 2, Items 1 and 2), tailgate release control
dump body control
valve lever (Figure 2, Item 3), and Power Take Off
malfunctions.
(PTO) switch (Figure 2, Item 4) for proper operation.
03/15/2011Rel(1.10)root(pmcswp)wpno(I1000226413)