TM 5-3805-254-20-2
REAR WHEEL - CONTINUED
NOTE
FOLLOW-ON MAINTENANCE: Dump truck lowered and supports removed (page 2-424).
TASK ENDS HERE
FRONT HUB AND BRAKEDRUM ASSEMBLY AND WHEEL BEARINGS
This task covers:
a
Removal (page 2-1176)
d
Inspection/Replacement (page 2-1180)
b
Disassembly (page 2-1178)
e
Assembly (page 2-1184)
c
Cleaning (page 2-1178)
f
Installation (page 2-1184)
INITIAL SETUP
Tools
Tools - Continued
Adjusting tool, brake
Wrench, hex, 5/16-inch
Blocks, wood, 4 x 4 x 18-inch
Wrench, torque, 0 to 150 ft lb
(22 x 22 x 46 cm) (three required)
(0 to 210 N.m)
Brush, cleaning
Gloves, safety
Materials/Parts
Goggles, safety
Hammer, cross-peen, 3-pound
Cup, inner bearing (if needed)
Pan, drain, 1-gallon
Cup, outer bearing (if needed)
Pliers, roundnose, 8-inch
Gasket, grease cap (one required)
Puller
Lockwasher, grease cap (three required)
Punch, driftpin, brass
Oil, lubricating (item 14, appendix C)
Screwdriver, flat-tip, 3/8-inch
Pin, cotter (one required)
Socket, 2 3/4-inch, 112-inch drive
Rags wiping (item 15, appendix C)
Wrench, adjustable
Seal, grease (one required)
Wrench, box-end, 7/16-inch
Solvent, drycleaning (item 19, appendix C)
TA244436
2-1175
