TM 5-3805-254-20-2
OIL RESERVOIR - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
22.
Reservoir (1)
Elbow (2)
a.
Wrap pipe threads with antiseizing tape
(page 2-424).
b.
Screw in and tighten using 1 5/16-inch
open-end wrench.
23.
Elbow (2)
Hose (3)
Screw on and tighten using 1 5/16-inch and
1 1/2-inch open-end wrenches.
24.
Reservoir (1)
Elbow (4)
a.
Wrap pipe threads with antiseizing tape
(page 2-424).
b.
Screw in and tighten using 3/4-inch
open-end wrench.
25.
Elbow (4)
Hose (5)
Screw on and tighten using 3/4-inch and 1-
inch open-end wrenches.
26.
Reservoir (1)
Filter (6)
Install (page 2-1237).
NOTE
FOLLOW-ON MAINTENANCE: Close left side hood panel (page 2-424).
TASK ENDS HERE
TA244476
2-1242