TM 5-3805-254-349-5.REAR-REAR DIFFERENTIAL MAINTENANCE (Con’t).13.Wrap strong twine around pinion (74) ofcross-shaft (60) and pull on horizontal line withspring scale. Preload torque should be 5-15 lb.-in. (0.5-1.7 N-m).14.If preload torque Is not correct, remove six bolts(53) and bearing retainer plate (52). Add shims(51) to decrease preload torque or removeshims to Increase preload torque.TA7039839-52
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business