TM 5-3805-254-34
CHAPTER 16
POWER TAKE-OFF MAINTENANCE
Paragraph
Page
Number
Paragraph Title
Number
16-1
Power Take-off Replacement......................................................................... 16-1
16-2
Air and Vacuum Shift Maintenance................................................................ 16-5
16-3
Power Take-off Repair ................................................................................... 16-8
16-4
Power Take-off Output Shaft Replacement ................................................... 16-16
16-5
Power Take-off Control Valve Replacement .................................................. 16-18
16-1.
POWER TAKE-OFF REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
Initial Setup:
Equipment Conditions:
Materials/Parts:
Air and vacuum shift removed (see paragraph 16-2).
One gasket
One retaining ring
Tools/Test Equipment:
Five copper washers
General mechanic's tool kit
a.
REMOVAL
1.
Mark propeller shaft (1) and universal joint (2) for
assembly.
2.
Disconnect oil hose (4) from power take-off (3).
TA704213
16-1