TM 5-3805-264-14&P
4-42.
MCS CONTROL UNIT MAINTENANCE (M917A1 W/MCS).
This task covers:
a. Removal
b. Disassembly
c. Cleaning and Inspection
d. Assembly
e. Installation
Initial Setup:
Equipment Conditions:
l Batteries disconnected (TM 9-2320-363-20).
Tools/Test Equipment:
Materials/Parts:
Marker tags (Item 19, Appendix F)
l General mechanics tool kit (Item 8, Appendix I)
a .
REMOVAL
1.
2.
3.
NOTE
Wires should be tagged before disconnecting (paragraph 4-17).
Remove four screws (7), washers (8), and MCS control unit (3) from shift tower (1).
Disconnect indicator light connector (5) from wiring harness connector (6).
Disconnect four wiring harness leads (4) from toggle switches (2). Remove MCS control unit (3).
4-39