TM 5-3805-274-13&P
0039
CONTROL LEVER ASSEMBLY REMOVAL
1. Remove four screws (Figure 1, Item 7) and lockwashers (Figure 1, Item 6) from control lever assembly
(Figure 1, Item 1) and pusher axle/PTO control panel (Figure 1, Item 5). Discard lockwashers
(Figure 1, Item 6).
2. Lift control lever assembly (Figure 1, Item 1) out of pusher axle/PTO control panel (Figure 1, Item 5).
3. Remove two nuts (Figure 1, Item 3), bolts (Figure 1, Item 16), washers (Figure 1, Item 17), clamp
(Figure 1, Item 18), control cable (Figure 1, Item 8), and spacer (Figure 1, Item 4) from control lever
assembly (Figure 1, Item 1).
4. Pull cotter pin (Figure 1, Item 21) out of retainer (Figure 1, Item 20) and remove retainer
(Figure 1, Item 20) from control lever assembly (Figure 1, Item 1). Discard cotter pin
(Figure 1, Item 21).
5. Loosen nut (Figure 1, Item 19) and remove retainer (Figure 1, Item 20) from end of control cable
(Figure 1, Item 8).
6. Disconnect wire (Figure 1, Item 2).
7. Remove control lever assembly (Figure 1, Item 1) from pusher axle/PTO control panel (Figure 1, Item 5).
END OF TASK
CONTROL CABLE REMOVAL
1. Remove cotter pin (Figure 1, Item 14), clevis pin (Figure 1, Item 10), and clevis (Figure 1, Item 11) from
control valve lever (Figure 1, Item 9).
2. Loosen nut (Figure 1, Item 12) and remove clevis (Figure 1, Item 11) from end of control cable
(Figure 1, Item 8).
3. Loosen two nuts (Figure 1, Item 13) and remove control cable (Figure 1, Item 8) from support bracket
(Figure 1, Item 15).
4. Pull control cable (Figure 1, Item 8) from pusher axle/PTO control panel (Figure 1, Item 5) and cab
floor.
0039-2