TM 5-3805-274-13&P
0039
CONTROL CABLE INSTALLATION
1. Route control cable (Figure 2, Item 8) from pusher axle/PTO control panel (Figure 2, Item 5) through
cab floor.
2. Install control cable (Figure 2, Item 8) on support bracket (Figure 1, Item 15) and tighten two nuts
(Figure 2, Item 13).
3. Install clevis (Figure 2, Item 11) on end of control cable (Figure 2, Item 8) and tighten nut
(Figure 2, Item 12).
4. Install clevis (Figure 2, Item 11) on control valve lever (Figure 2, Item 9) with clevis pin
(Figure 2, Item 10) and cotter pin (Figure 2, Item 14).
END OF TASK
CONTROL LEVER ASSEMBLY INSTALLATION
1. Position control lever assembly (Figure 2, Item 1) over pusher axle/PTO control panel (Figure 2, Item 5).
2. Install control cable (Figure 2, Item 8) and spacer (Figure 2, Item 4) on control lever assembly
(Figure 2, Item 1) with two bolts (Figure 2, Item 16), washers (Figure 2, Item 17), clamp
(Figure 2, Item 18), and nuts (Figure 2, Item 3).
3. Connect wire (Figure 2, Item 2).
4. Install retainer (Figure 2, Item 20) on end of control cable (Figure 2, Item 8) and tighten nut
(Figure 2, Item 19).
5. Install retainer (Figure 2, Item 20) on control lever assembly (Figure 2, Item 1) with cotter pin
(Figure 2, Item 21).
6. Install control lever assembly (Figure 2, Item 1) on pusher axle/PTO control panel (Figure 2, Item 5)
with four new lockwashers (Figure 2, Item 6) and screws (Figure 2, Item 7).
0039-4