TM 5-3805-254-20-2
DRY AIR RESERVOIR
This task covers:
a.
Removal (page 2-976)
d.
Inspection/Replacement (page 2-980)
b.
Disassembly (page 2-978)
e.
Assembly (page 2-982)
c.
Cleaning (page 2-980)
f.
Installation (page 2-984)
INITIAL SETUP:
Tools
Materials/Parts
Brush, wire
Locknut, step (four required)
Extension, 6-inch, 112-inch drive
Lockwasher, cable assembly (two required)
Flashlight
Rags, wiping (item 15, appendix C)
Gloves, safety
Solvent, drycleaning (item 19, appendix C)
Goggles, safety
Tags, marker (item 21, appendix C)
Handle, ratchet, 1/2-inch drive
Tape, antiseizing (item 22, appendix C)
Socket, deep, 9/16-inch, 112-inch
drive
Personnel Required
Socket, square, 3/8-inch, 1/2-inch
drive
Two
Wrench, box-end, 9/16-inch
Wrench, open-end, 9/16-inch
References
Wrench, open-end, 3/4-inch
Wrench, open-end, 11/16-inch
TM 43-0139 (Painting Instructions for Army
Wrench, open-end, 13/16-inch
Materiel)
Wrench, open-end, 7/8-inch
Wrench, open-end, 1-inch
Wrench, open-end, 1 1/4-inch
Wrench, open-end, 1 3/8-inch
Change 1 2-975
