TM 5-3805-254-20-2
AIR DRYER - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION
WARNING
Assistance will be needed to support air dryer while performing steps 46, 47, and 48. Failure to observe
this precaution could cause injury to personnel.
46.
Frame rail (1)
Air dryer (2), right
Put in place alining holes in right and left
bracket (3), and
brackets with holes in frame rail.
left bracket (4)
47.
Right bracket (3)
Two screws (5) and
Screw in and tighten using 3/4-inch, 112-
two nuts (6)
inch drive socket, 3-inch extension, ratchet
handle, and 3/4-inch box-end wrench.
48.
Left bracket (4)
Two screws (7) and
Screw in and tighten using 3/4-inch, 1/2-
two nuts (8)
inch drive socket, 3-inch extension, ratchet
handle, and 3/4-inch box-end wrench.
49.
Air dryer (2)
Pressure relief
Turn air dryer to position pressure relief
valve (9)
valve toward front of dump truck.
NOTE
Step 50 is typical for top and bottom clamps.
50.
Clamp (10)
Pinch screw (11)
Tighten using two 1/2-inch box-end
and nut (12)
wrenches.
51.
Air dryer (2)
90-degree elbow (13)
Wrap pipe threads with antiseizing tape.
TA244342
2-1012