TM 5-3805-264-13&P
0039
INSTALLATION
WARNING
Use extreme care when handling heavy parts. Lifting cables, chains, hooks, and slings
must be in good condition and of suitable capacity. Keep clear of parts supported only by
lifting device. Failure to comply may result in personnel injury, death, and/or damage to
equipment.
1.
Raise cab shield (Figure 2, Item 1) to dump body (Figure 2, Item 6).
2.
Install two screws (Figure 2, Item 3), four washers (Figure 2, Item 4), and two new locknuts
(Figure 2, Item 5) on top of cab shield (Figure 2, Item 1) and dump body (Figure 2, Item 6).
3.
Install six screws (Figure 2, Item 7), 12 washers (Figure 2, Item 8), and six new locknuts (Figure 2, Item 9)
on outside edges of cab shield (Figure 2, Item 1) and dump body (Figure 2, Item 6).
4.
Remove lifting slings (Figure 2, Item 2) from cab shield (Figure 2, Item 1).
5.
Raise and support dump body on body props (WP 0005).
6.
Install six screws (Figure 2, Item 7), 12 washers (Figure 2, Item 8), and six new locknuts (Figure 2, Item 9)
on center of cab shield (Figure 2, Item 1) and dump body (Figure 2, Item 6).
7.
Torque 12 locknuts (Figure 2, Item 9) and two locknuts (Figure 2, Item 5) to 150 lb-ft (203 Nm).
Figure 2. Cab Shield Installation.
END OF TASK
03/15/2011Rel(1.10)root(maintwp)wpno(M1002826413)