TM 53805-254-20-2
PUMP-TO-VALVE PRESSURE HOSE AND FITTINGS
This task covers:
a. Removal (page 2-1386)c. Inspection/Replacement (page 2-1388)
b. Cleaning (page 2-1386)d. Installation (page 2-1388)
INITIAL SETUP
Tools
Personnel Required
Brush, cleaning
One
Container, 6-gallon
Gloves, safety
Goggles, safety
Equipment Condition
Gun, blow, air
Hose, air assembly
Wrench, open-end, 1 1/4-inch
Dump body raised and secured (page 2-424).
(two required)
Wrench, open-end, 1 318-inch
References
Materials/Parts
(LO 5-3805-254-12) Lubrication Order
Detergent, liquid, GP (item 7, appendix C)
Oil, lubricating, OE/HDO/30 (item 14,
appendix C)
Solvent, drycleaning (item 19, appendix C)
Tape, antiseizing (item 22, appendix C)