TM 5-3805-264-14&P
CHAPTER 5
DIRECT SUPPORT MAINTENANCE
Section I. DUMP BODY MAINTENANCE
Paragraph
Number
Paragraph Title
Page
Number
5-1.
Dump Body and Stabilizer Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5-1
5-2.
Cylinder Support Frame Replacement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5-7
5-1.
DUMP BODY AND STABILIZER REPLACEMENT.
This task covers:
a. Removal
b. Installation
Initial Setup:
Equipment Conditions:
Materials/Parts:
Chassis-to-dump body air lines disconnected
(paragraph 4-59).
Chassis-to-dump body electrical harnesses dis-
connected (paragraphs 4-44 thru 4-47).
Mud flaps removed (paragraph 4-63).
Tools /Test Equipment:
General mechanics tool kit (Item 8, Appendix I)
Nylon slings (Item 6, Appendix I)
Torque wrench (Item 12, Appendix I)
Suitable lifting device with chains
Fourteen locknuts
Wooden blocks
Personnel Required: Three
References:
TM 9-2320-363-10
TM 9-237
General Safety instructions:
Use extreme caution when handling heavy parts.
NEVER work under a raised dump body unless it
is secured in the raised position with body props
and dump body is EMPTY.
1.
Remove six locknuts (2) and screws (1) from
left and right angle brackets (3). Discard lock-
nuts.
5-1