• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Fig. 5-26 Removing torque converter housing
Fig. 5-37 Removing second-clutch snapring

Technical Manual For Truck, Dump, 20 Ton, 6 X 4, On-Off Highway 71,000 Gvw Ihc Model F-5070 (Cce) - 2
Page Navigation
  722    723    724    725    726  727  728    729    730    731    732  
img
TRUCK SERVICE MANUAL
TRANSMISSIONS
DISASSEMBLY
Para5-9
Fig. 5-31 Removing forward clutch assembly
Fig. 5-32 Removing fourth-clutch assembly
(4) Refer to paragraph 6-18 for rebuild of the forward
clutch and turbine shaft a assembly.
(5) Place the hooked legs of lifting tool 18 (fig. 4-2)
under the edges of the fourth clutch spring retainer (fig.
5-32).
NOTE
Keep both front and rear bearing races with the clutch
assembly during rebuild.
(6) Refer to paragraph 6-18 for rebuild of the fourth-
clutch assembly.
b. Third Clutch
(1) Remove the snapring (fig. 5-32) that retains the
third-clutch back plate. Re move the back plate. Fig. 5-
33 Center support anchor bolt
(2) Remove eight third-clutch plates.
Fig. 5-33 Center support anchor bolt
NOTE
Tie the third-clutch plates together, and identify the pack.
Identification is required at assembly.
731


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.