TM 5-3805-254-20-2
DUMP BODY CONTROL LEVER AND LINKAGE
This task covers:
a
Removal (page 2-1367)
c
Installation/Adjustment (page 2-1370)
b
Inspection/Replacement
(page 2-1370)
INITIAL SETUP
Tools
Personnel Required
Pliers, long-nose, 6-inch
Two
Pliers, slip-joint, 8-inch (two required)
Tape, measuring, steel, 25-foot
Equipment Conaition
Wrench, box-end, 7/16-inch
Wrench, open-end, 3/4-inch
Left side cab door opened (page 2-424).
Center floor board cover plate removed
Materials/Parts (page 2-1262).
Pin, cotter, clevis pin
Lockwasher, clamp (six required)
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
1. Clevis (1)
Nut (2)
Using 3/4-inch open-end wrench and 8-
inch slip-joint pliers, loosen one turn.
TA244565
2-1367