TM 5-3805-264-13&P
0061
INSTALLATION - Continued
11.
Place transmission selector lever in N (Neutral) position (TM 9-2320-363-10 or TM 9-2320- 302-10).
12.
Connect six connectors (Figure 13, Item 3) to shift tower jumper harness connectors.
13.
Remove two top and two bottom screws (Figure 13, Item 2) on front and rear of shift tower
(Figure 13, Item 1).
Figure 13. Connector Installation.
03/15/2011Rel(1.10)root(maintwp)wpno(M1003826413)