• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Shift Tower Removal.
Figure 7. Hardware Installation.

Parts Manual For Truck, Dump, Heavy, Body M917A1 And M917A2
Page Navigation
  303    304    305    306    307  308  309    310    311    312    313  
img
.
TM 5-3805-264-13&P
0062
REMOVAL - Continued
20.
At hydraulic pump, turn jam nut (Figure 6, Item 2) over entire length of threads on cable (Figure 6, Item 1).
21.
Remove two screws (Figure 6, Item 4), flatwashers (Figure 6, Item 6), and washers (Figure 6, Item 5) from
flange clamp (Figure 6, Item 7).
22.
Slide flange clamp (Figure 6, Item 7) away from bonnet (Figure 6, Item 3).
23.
Unscrew bonnet (Figure 6, Item 3) and slide spacer (Figure 6, Item 8) along cable (Figure 6, Item 1) until
cable bracket (Figure 6, Item 10) can be accessed.
24.
Remove cotter pin (Figure 6, Item 13) and clevis pin (Figure 6, Item 9) from hydraulic pump actuator
(Figure 6, Item 11).
25.
Remove nut (Figure 6, Item 12) and cable bracket (Figure 6, Item 10).
26.
Count number of threads from end of cable (Figure 6, Item 1) to nut (Figure 6, Item 14).
27.
Remove nut (Figure 6, Item 14).
Figure 6. Hardware Removal.
END OF TASK
0062-7
03/15/2011Rel(1.10)root(maintwp)wpno(M1003926413)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.